Sold 205± Acres

Holmes County

Turnkey Recreational Farm with Custom Home and Horse Arena

1974 Highway 177A Bonifay, FL 32425

Description

Once in a lifetime opportunity to own a turnkey legacy property. This picturesque ranch offers unlimited opportunities for hiking, horseback riding and four-wheeling on well-maintained trails. In addition, enjoy hunting, fishing, and shooting at targets with your bow or pistol. Fishing in the stocked, spring-fed 40-acre lake could produce largemouth bass, bream or catfish. The backwaters of the lake also provide a duck haven. With approximately 37 acres of fenced, rolling pastures, this property is ideal for horses and cattle.

This custom-designed home features an open floor plan with 3,600 feet of living space. A gourmet kitchen is the perfect entertaining opportunity with commercial grade appliances, quartz countertops and an oversized island - all underneath a bricked, arched ceiling. With a large sitting area, the great room features a fireplace and wet bar. An oversized master suite offers a vaulted ceiling and an additional fireplace. Outdoor living space includes a covered lanai with a custom, high-end cook area. In addition, the gunite pool is the perfect spot to enjoy the Florida sunshine. Guests can stay in the newly renovated two-bedroom cottage with a kitchen and living room, as well as a great spot to enjoy scenic views from the covered porch.

This property also includes a large horse stable and arena with multiple stalls, an air-conditioned tack room, bathroom, and personal fitness area. A double-wide mobile home, equipment barn/workshop, and barbeque shed occupy the property as well. In addition, a separate barn, perfect for a man cave or added space for entertainment, is located near the cottage. A pond and custom dock, complete with a fish feeder, is adjacent to the barn. This would be the ideal space for extended family reunions or large gatherings.

Don’t miss out on this rare and beautiful property. Call me today for a private showing.


Summary

Address

1974 Highway 177A

Bonifay, FL 32425

View on Google Maps

Features

Food Plot, Tree Stands, Recreational Improvements, Trail Network, Internal Road System, Metal Buildings, Shop, Barn, Highway, Pavement, Cross Fence, Partial Fence, Pasture, Hay, Low Fence, Wild Game, Upland Game, Dove, Quail, Big Game, Whitetail, Small Game, Other Game, Turkey, Hog, Waterfowl, Duck, Waterfront, Creek, Spring, Wetlands, Frontage, Improvements, Hunting Improvements, Feeders, Swimming Pool, Dock, Boat Ramp, Infrastructure Improvements, Building Improvements, Gated Entrance, Investment, Fish, Catfish, Bass, Panfish, Roads, Road Frontage, Road Access, Fence, Fence Material, Wire, Wood, Iron, Pine Trees, Hardwood Trees, Livestock Facilities, Tub, Working Pens, Outdoor Arena, Stables, Tack Room, Wash Rack, Housing, Home, Cabin, Utilities, Electric, Generator, Water, Septic, Internet, Cable, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, Boating, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Lake (3+ acres), Pond (0-3 acres), Lake, Wells/Pumps, Rock/Stone, Show Barn/Show Arena

Land Type

Hunting and Recreational, Home on Acreage, Timberland

Property Type

Ranches, Recreational Land, Residential Land, Timberland

Land and Farm Property Types

Agriculture - Pasture/Ranch, Land - Recreational, Land - Residential, Timberland - Natural

Road Frontage

State Highway

Road Surface

Pavement

Fencing

Low Fence, Cross, Partial

Outbuildings

Metal, Shop, Barn

Land Details

Pasture, Timber, Hay

Improvements/Features

Food Plot, Tree Stands/Blinds, Trail Network, Internal Road System

Details

  • Turnkey (call agent for detailed list)
  • 3600 +/- sq ft custom brick home
  • Gunite pool
  • Guest cottage
  • Horse stable/arena
  • Completely remodeled double wide mobile home
  • Multiple outbuildings
  • Fenced/crossed fenced
  • Flowing creek
  • Gated entry
  • Paved driveway
  • Irrigation
  • Security system throughout
  • Stocked 40 +/- acre spring fed lake with private dock
  • Well-maintained landscaping
  • Pistol range
  • Bricked outdoor barbeque pit
  • Food plots
  • Deer stands
  • Well-maintained trail system

Area Links


Other

Utilities

electric
Onsite
generator
Onsite
water
Onsite
sewer
Onsite
internet
Onsite
cable
Onsite

Coordinates

30.8506, -85.7622

Annual Taxes

$11,353

Sold Property

Nearby Related Properties


Reduced
$77,580 18 acres ±
Washington County • Bonifay, FL 32427
Reduced
$58,185 13.5 acres ±
Washington County • Bonifay, FL 32427
New
$87,850 10 acres ±
Washington County • Vernon, FL 32462
New
$87,850 10 acres ±
Washington County • Vernon, FL 32462
New
$87,850 10 acres ±
Washington County • Vernon, FL 32462
New
$87,850 10 acres ±
Washington County • Vernon, FL 32462
For Sale
$660,000 132 acres ±
Washington County • Chipley, FL 32428
Reduced
$129,900 20 acres ±
Jackson County • Cottondale, FL 32431
Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.