Sold

Country Home With Beautiful Views And Morton Building For Sale Between Mendota And Rochelle

Acreage

6.95 ±

County

Lee

SOLD

Address 976 Paw Paw Road Paw Paw, IL 61353

View on Google Maps

Description

Situated amongst the rolling hills and timber sits this amazing log-sided home. The house sits up on the hill providing beautiful views in every direction. Off the front of the home are two decks, as well as a large deck off the rear of the home. Entering the home, you will notice a nice open flow from the family room into the kitchen and dining area. Vaulted ceilings with large windows let in an abundance of natural light. The rocks and stones in the fireplace came from this property when they were excavating the basement. The fireplace is double-sided and shares the ambiance with the family room as well as the primary bedroom. The kitchen has an island with bar seating, lots of counter space and cabinets, and new appliances in 2022. The kitchen is open to the main dining area. On one wing of the house is a large primary bedroom with its own full bathroom and a large closet. The slider off the primary bedroom takes you to the rear deck. The other side of the house has two good-sized bedrooms and a full bathroom for these rooms to share. You will find the laundry on the first floor as well. The lower level has a ton of potential with a walkout door, large windows, and tall ceilings. The main room has the potential for another family room or game room. The shop area could be converted into a gun safe. In-floor heat runs throughout the basement and continues to the exterior patio area that currently has kennels, as well as the garage area. The garage has a floor drain and water to wash your vehicles inside. The generator hookup is located in the garage. The lower level has a full bathroom and access to the second shop room that has a sink and leads to the outside patio area. The beauty and possibilities don't end when you leave the home. This property is its own oasis with fruit trees and open fields that could be converted into pasture or remain natural for the wildlife that visits. An area in the rear of the property would be a perfect spot for a pond. The property is partially fenced on its perimeter with paddocks for livestock, and there is a 36x45 Morton building with electricity. Quick access to I-39. Contact Land Specialist Todd Henry today to schedule your showing of this outstanding property.

Details

  • 3 bedrooms, 3 bathrooms
  • Open floor plan
  • Lower level walkout
  • 2 work rooms in basement
  • In-floor heat
  • 36x45 Morton building
  • Area that has a good start to a pond

Summary

Land Type

Home on Acreage

Property Type

Recreational Land, Horse Property, Ranches

Land and Farm Property Types

Agriculture - Horse, Agriculture - Pasture/Ranch, Land - Residential

Road Frontage

County Road

Fencing

Partial

Outbuildings

Barn

Land Details

Pasture, Timber, Open

Improvements/Features

Small Game, Big Game, Equine Facilities

Activities on Property

Hunting, Hiking, ATV Riding, Horseback Riding, Family Activities, Camping, Biking

Roads

Road Frontage

Type of Home

Log Home, Residential, Cabin

Nearby Features

Public Fishing, Public Access Area, Marina, Camping/Campground, Airport, Boat Ramp, RV Park, Golf Course

Livestock Facilities

Equine

Wild Game

Small Game, Big Game

Recent Property Improvements

Livestock facilities, Equine facilities

Road Surface

Blacktop/Asphalt

Feeds

Lands of America

Other Property Details

Utilities
  • propane: onsite
  • sewer: onsite
  • electric: onsite
  • water: onsite
Coordinates

41.7266, -88.9972

Annual Taxes

$0

Sold Property

For more information or to see additional properties currently for sale see Todd Henry's listings.

Nearby Related Properties


For Sale
$125,000 5.31 acres ±
Lee County • Compton, IL 61318
For Sale
$1,650,000 161.32 acres ±
LaSalle County • Sandwich, IL 60548
Reduced
$685,000 40 acres ±
Kane County • Maple Park, IL 60151
Reduced
$644,900 17 acres ±
DeKalb County • Kirkland, IL 60146
New
$825,000 75 acres ±
LaSalle County • Ottawa, IL 61350
For Sale
$315,000 21 acres ±
Ogle County • Stillman Valley, IL 61084
For Sale
$50,000 1.58 acres ±
Ogle County • Stillman Valley, IL 61084
For Sale
$235,000 7.4 acres ±
Bureau County • Princeton, IL 61356
Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.